Project Highlights

Genesis South Tower Floors 9-12 - Plumbing
South San Francisco, CA
Project Lead: Jesse Vogan

We are finishing up the rough-in of core & shell spec lab space on floors 9-12 of Genesis South Tower in SSF with Whiting-Turner Construction. This project includes new plumbing utilities for future lab space and plumbing infrastructure to support WAM’s new lab air handlers and all-electric rooftop equipment. The Plumbing project team comprises Suraj Thapa, Mitchell Berger, Ricardo Neri, and Aaron Ibarra. Thanks to the hard work of this team, we are now looking at moving forward with the Tenant Improvement work!

Hexagon Suite D - Plumbing
Menlo Park, CA
Project Lead: Jesse Vogan

This project included clean dry air, lab vacuum, and plumbing utilities for new lab space, in coordination with CP Construction. Our field team, led by Zach Brower, was tasked to come up with innovative solutions to support our new piping from the existing structure. Zach delivered and the project was a success! Our Project Manager, Kelly Britland, executed another successful Plumbing project and further developed our relationship with the CP / Tarlton team.

Ariat - Plumbing
San Leandro, CA
Project Lead: Jesse Vogan

Phase 1 of our first project with Peacock Construction consisted of 4 floors of Tenant Improvement for Ariat, a “blue collar” clothing company, which is a favorite among our workforce. Rough-in is complete on this phase of the project and our design Engineer, Mario Carranza, has just started working on Phase 2. Phase 2 consists of a large 1st-floor kitchen and café, which WAM Plumbing will be starting upon completion of Phase 1. Shout out to our Foreman, Kevin Asti, and our Project Manager, Kelly Britland, for successfully navigating our team through several design changes.

Big Hat - Plumbing
San Mateo, CA
Project Lead: Jesse Vogan

WAM completed the core & shell at 1900 Alameda De las Pulgas and BigHat’s original tenant improvement work, and thanks to the success of those projects BigHat and XL Construction knew who to call when they wanted to expand to the 4th floor. The 4th-floor project included the reconfiguration of existing lab space and the build-out of a new Cell Culture lab. New utilities included domestic plumbing, clean dry air, lab vacuum, and CO2. Ricardo Neri and Aaron Ibarra oversaw our field team and our Project Manager was Kevin Ng.

Billion to One - Controls
Union City, CA
Project Lead: Chalini Ekanayake

This project consisted of installing a new Honeywell Niagara 4 Building Management System (BMS) to serve a one-story lab and office building just shy of 90,000 SF. Brand new Honeywell TC500A-N commercial thermostats were installed to control 29 total package units and were integrated into the BMS through BACnet MS/TP. The new control system also monitors 5 new AAON units that serve lab areas pertinent for BilliontoOne to carry out precision molecular diagnostics.

Tech Company - Controls
San Francisco, CA
Project Lead: Chalini Ekanayake

A central Honeywell WEBs-N4 Building Management System (BMS) was installed to serve this four-story office building in the heart of San Francisco. Honeywell Spyder Unitary and VAV controllers were utilized throughout the system to control the Rooftop Equipment along with VAV boxes for optimal comfort. The BMS successfully integrated with a new VRF system serving I.D.F. rooms throughout the building and the next-door warehouse.

Shellmound Lab Conversion
Emeryville, CA
Project Lead: Kevin Bianchi

Conversion of an industrial building to 2 spec suites of 50-50 lab-office space. The building will be entirely gutted and will have all new HVAC systems including new air-cooled chiller plants, condensing boiler plant, and custom AHUs for air distribution to lab & office spaces.

1804 Embarcadero & 2445 Faber Lab Conversions
Palo Alto, CA
Project Lead: Kevin Bianchi

Conversion of two existing office buildings to 2 spec suites per building of 50-50 lab-office space. The building will have all new HVAC systems serving new lab spaces including new 100% OSA package units, lab exhaust fans, condensing boiler plants, and new HHW piping & air distribution to lab & office spaces.