We’re Hiring!

Why You Want to Work for Western Allied Mechanical

Cybersecurity Solutions Leader Headquarters

Sunnyvale, CA
Project Summary

Design-Build, ground up 4-story, 172,000SF with atriums and high-end interior finishes. LEED GOLD high energy efficiency designed with pre-cast radiant ceiling planks, radiant floors, all-electric rooftop heat pumps, VRFs and ceiling fans. The night flush design allows to cool off the concrete mass at night, and  reduce the chiller usage during peak time the next day. Ceiling Fans are able to blend the cooled air from the pre-cast ceiling planks down to the workspace to create even temperature distribution, unlike the traditional forced-air system to blow air across the space.

 

Market Sectors
  • LEED/Energy Efficiency
  • Commercial
Services
  • Engineering
  • Mechanical
  • BIM/VDC
Similar Projects
  • 279 East Grand Core and Shell and TIs

    South San Francisco, CA
  • Canada College B23 Math, Science and Technology Building

    4200 Farm Hill Blvd., Redwood City, CA
  • Dropbox HQ

    San Francisco, CA
  • Private: Exelixis HQ

    Alameda, CA
  • Private: Packard Foundation Los Altos Headquarters

    343 Second Street, Los Altos, CA 94022
  • UCSF Clinical Sciences Building

    513 Parnassus Ave, San Francisco, CA 94143
  • SLAC B53 Science and User Support Building

    2575 Sand Hill Rd, Menlo Park, CA 94025
  • Skyline College B12 New Environmental Science Building

    3300 College Drive, San Bruno, CA
Connect With Us

Let us know about your next project or partnering needs.