Retrofit Projects
Western Allied has an entire team that specializes in retrofit projects including critical facilities. We have developed methods for design and installation that decrease "down time" for the client while still providing a top quality system. As with all of our design, we incorporate energy efficient strategies to transform buildings from energy wasters to energy savers.
Wells Fargo Bank
Equipment Replacement and DDC retrofit at multiple branches
Bank of America
SF Headquarters
111 Pine Street
San Francisco, CA
Federal Reserve Bank
San Francisco, CA
Energy retrofit and coil replacement
Stanford Linear Accelerator Laboratory
Multiple Projects
FOLLOW US:
1180 O'Brien Dr. • Menlo Park, CA 94025
Phone: 650.326.0750 • Fax: 650.321.4946
Email: info(at)westernallied.com